Platform Overview
Smart EPD organizes work through a five-level hierarchy. Each layer constrains the next, from who participates, to what rules apply, to what products are assessed, to the EPD output itself.
Organization
An Organization represents a company or entity on the platform. Every user belongs to exactly one organization, and every action traces back to one. Organizations are assigned a type:
- Manufacturing Group -Produces physical products that need EPDs. A single enterprise may contain multiple manufacturing groups.
- Tool Provider -Develops and maintains LCA/EPD creation software (including Excel-based tools).
- Consultant -Performs LCA work and EPD creation on behalf of manufacturers.
- Verifier -Reviews and certifies specifications, EPD Templates, and EPDs for compliance.
Workspace
A Workspace is a shared collaboration space where two or more organizations work together on EPD-related activities. Think of it as a joint venture room: it defines who is at the table and what role each organization plays.
Each organization has one role per workspace (e.g., Org A is the manufacturer, Org B is the tool provider, Org C is the verifier). An organization can participate in many workspaces simultaneously with different partners.
Workspaces govern membership and permissions; the actual content and rules live in Categories and projects.
Category
A Category is the governed scope of work within a workspace. It defines the rules for a specific product category:
- Which PCRs apply -e.g., Part A / Part B1 / Part B2
- Which tool is used -for tool-based Categories, exactly one tool is registered
- The PCR Specification -the versioned definition of rules and requirements for the category
Categories come in two modes:
| Tool-based Category | Manual Category | |
|---|---|---|
| Tool | Required: a specific LCA tool is registered | None: external software used |
| Verification | Tool/model verified at the project level via LCA + template review | Verification happens per-EPD |
| EPD Template | Full specification chain with semver versioning, resolved per project | No template or very slim |
| Scalability | Verify once, produce many variant EPDs | Linear: each EPD reviewed individually |
The Category is the policy layer: it answers "For this PCR, using this tool, what does a compliant EPD look like?"
Project
A Project is a single product assessment within a Category. It inherits its PCR and tool from the parent Category, and this is where the specification chain resolves into a concrete EPD Template with locked fields, unlocked fields, and validation constraints. The project defines:
- The specific product type, family, and line being assessed
- The team (individual users drawn from workspace member organizations)
- The EPD Template (resolved from the specification chain, verified by the verifier), including any input constraints required for variant EPDs
- One or more EPDs for that product
Projects are the day-to-day working unit. They can be duplicated within the same Category for similar products.
EPD (Environmental Product Declaration)
The EPD is the deliverable: a standardized document declaring the environmental impact of a product. Smart EPD supports two distinct approaches depending on whether the Category is manual or tool-based.
Traditional workflow (manual Categories)
In a manual Category, LCA practitioners use external software and submit each EPD individually for verifier review:
Every EPD is individually reviewed by a verifier. This approach is appropriate for one-off assessments or low-volume product lines.
Reference & variant workflow (tool-based Categories)
In a tool-based Category, the verifier certifies the tool once at the Category level, and then once per LCA/EPD template at the project level. This unlocks scalable EPD production with two distinct EPD types:
Reference EPD -Produced during project verification to setup subsequent variant EPDs with compliant output. It is a verification artifact, not a production document.
Variant EPD -The actual production EPD created by manufacturers for specific products. Because the tool, template, and constraints have been pre-verified, variant EPDs do not require individual verifier review; they pass through automated validation against the approved template.
This is the core efficiency gain of tool-based verification: verify once at the Category and Project levels, then produce many compliant variant EPDs without per-EPD review overhead.
Comparing the two approaches
| Traditional (Manual Category) | Reference & Variant (Tool-Based Category) | |
|---|---|---|
| Verification target | Each individual EPD | The tool + EPD Template (once per Category) |
| Verifier involvement | Reviews every EPD | Reviews tool & reference EPD(s); variants auto-validated |
| Scalability | Linear: cost grows with each EPD | High: verify once, produce many |
| EPD types | Standard EPDs only | Reference EPDs (verification) + Variant EPDs (production) |
| Best for | One-off assessments, low volume | High-volume product lines, tool providers, automated pipelines |
What's next
- Terminology -Full glossary of platform concepts including specifications, templates, and constraint types
- EPD Templating -How templates enforce value ranges and validation constraints